
The North Field South (NFS) LNG Project is a major expansion of Qatar’s liquefied natural gas infrastructure, developed to significantly enhance LNG production capacity and strengthen global energy supply. The project forms a key part of Qatar’s long-term strategy to maintain its leadership in the LNG sector.
WYSE was engaged to provide structural shop drawings, rebar detailing, and Bar Bending Schedules (BBS) for critical onshore infrastructure elements, with a primary focus on pipe rack structures supporting LNG process facilities.
QatarEnergy
QatarEnergy is the state-owned energy company responsible for the development and operation of Qatar’s oil and gas resources, including the North Field LNG expansion projects.
WYSE provided specialized structural engineering and detailing services, supporting construction activities through accurate and coordinated deliverables.
Scope included:
Preparation of structural shop drawings for pipe rack structures
Reinforcement detailing for Precast and Cast-in-Place concrete elements
Development of Bar Bending Schedules (BBS)
Coordination with design drawings and construction requirements
Compliance with project specifications and international standards
Significance
The North Field South LNG Project plays a vital role in meeting future global energy demand while maintaining operational efficiency and sustainability. WYSE’s contribution ensured accurate, constructible, and well-coordinated structural documentation, supporting successful execution of critical onshore infrastructure.
High-accuracy detailing to support fast-track construction schedules
Large-scale pipe rack systems with complex reinforcement requirements
Strict adherence to quality, safety, and documentation standards
Support for critical energy infrastructure of global importance
location
Ras Laffan Industrial City, Qatar
sector
LNG Pipe Rack - Precast
technology
AutoCAD, CADS RC, MS Excel
scope of work
Structural shop drawings, rebar detailing and bar‑bending schedules
Wyse Services
Drafting, quantity take‑off, clash detection, QA/QC
completion date
25 Dec, 2025

We go beyond design and delivery—offering continued technical support, model updates, and lifecycle insights even after project handover.